These systems make it possible to manage road demand and commuter incentives at national scale. MTSAi is designed to operate on top of that infrastructure.
Secure Identity at Scale
Secure identity verification for over a billion residents, enabling trusted digital participation in public programmes.
Real-Time Payments
Real-time digital payments at massive scale, making it possible to distribute incentives directly to commuters. More than 20 billion transactions are processed every month.
Nationwide Electronic Tolling
Nationwide electronic tolling connecting more than 8 crore vehicles to road infrastructure, allowing automated vehicle identification without additional roadside hardware.
Smart City Command Centres
Integrated Command and Control Centres are operational across multiple Smart Cities, providing real-time urban traffic monitoring and coordination infrastructure.
Together, these systems form a digital foundation that few countries possess.
The Missing Layer: Demand Management
While India has built extraordinary infrastructure, urban congestion continues to grow in major cities. Road capacity alone cannot solve the problem. Congestion is ultimately driven by when and how people choose to travel.
Demand-management tools help cities influence those choices. MTSAi is designed specifically to provide that layer using what India has already built.
India built the infrastructure. MTSAi provides the demand layer.
Why India Can Lead
India has repeatedly demonstrated its ability to deploy digital public infrastructure at unprecedented scale. Aadhaar, UPI, and FASTag have transformed the way public systems operate. The next step is applying that same digital capability to urban mobility.
By aligning commuter incentives with the public good, India has the opportunity to pioneer a new model of congestion management — one that other countries will study and follow.
Policy instruments for congestion demand management are supported by operational infrastructure and public accountability. Information on this website is provided for evaluation and planning. Capabilities, deployment models, timelines, and compliance measures are finalized through RFP/contract and may vary by department requirements.